RAJUK is implementing Purbachal New Town Project with a view to developing a modern, well planned and fully functional township near Dhaka City, Introducing an independent, full-fledged township or satellite city in Rupganj Upazila of Narayanganj district and Kaliganj, Gazipur district.
The Purbachal New Town project will be a modern well-planned smart green city within a total area of 6227 acres of land. The complete planning includes a plan for 25,016 Residential Plots of various categories, along with sufficient administrative, commercial, educational, institutional and social infrastructures as well as scopes for high-rise Apartment blocks for apartment construction to solve acute shelter crisis.
Under
this project, the project was taken up on 150 acres of Khilkhet Thana in Dhaka
district, 15,000 acres of Kaliganj Thana in Gazipur district and 4, 757 acres of
Rupganj in Narayanganj district under the Capital Detailed Area Plan (DAP)
area. Around 60,000 apartments will be constructed in the whole project. As per
RAJUK sources, all the preliminary work of the project has already been
completed. Its implementation will start in a very short time.
Plans
have been made to build a total of 60,000 apartments in Purbachal New Town
project:
- 8 high-rise apartment blocks
- 9 low-income apartment blocks
- There will be several standard type apartments ranging from 1500 sq ft to 3500 sq ft, three types of flats for lower, middle and upper class buyer
- There will be also 400 - 500 sq ft flats for lowest income people
- The average height of the buildings will be between 20-50 floors
- The project will include basement, car parking and other amenities
- Each block will be modernized with proper use of sunlight and rain water including park / playground, mosque, deep tube well, adequate security system, garden facilities etc.
According to the latest general meeting of RAJUK, Prime Minister Sheikh Hasina has approved the creation of the required number of plots and allotment of plots among the original residents and general victims of the Purbachal New Town project. Based on the Prime Minister's approval, RAJUK decided to create 1,197 three-katha plots on 89 acres of land from the Highrise Apartment Block in Sectors 15 and 28 of the project by Data Experts (Pvt. Ltd.), a consulting firm for the Purbachal New Town project. As a result, a total of 14 blocks of apartments, including 5 high-rise apartment blocks and 9 low-income apartment blocks, will remain for construction.
In this case, out of 5 high-rise apartment blocks in the remaining 3 sectors: One sector (Sector-3) through PPP basis, 2 blocks and 6 blocks for lower income people in 6 sectors (Sectors No. 8, 9, 10, 13 and 25) and 2 sectors of high rise apartments through RAJUK (Sector No. 2 and 30) It is recommended to implement the work as a pilot project by formulating DPP in 3 blocks of 3 sectors (Sector No. 3, 4 and 18) for low income people, as a guideline for construction of high rise apartment block in PPP method.
According
to RAJUK sources, several officials are already working to finalize the Purbachal
new town project. They will take the project to the final stage after judging
and analyzing all the issues. The chairman of RAJUK told that some officials
have been given the responsibility. They will check everything and present it
to us. After that we will make the final decision.
As
per the information’s provided (14th December, 2020) on the official web site
of RAJUK, the present situation of the Purbachal New Town Project is as per
followings:
Site
development:
Site development works of sector 1-5, 8,9,11,12,13,14, 17-20, 22, 23 and 29-30 have nearly been completed. In other sectors, the site development works are on-going. Site Development of Gazipur part has been started and process is 60%.
Construction
of Road:
Road construction works in sector no 1, 3, 4, 5, 8, 9, 11, 13, 14, 17, 20, 29 and 30 have been mostly completed. In sector no. 2, 7, 10, 18 and 19 road construction works are going on. In other sectors, roads will be constructed after significant progress of development works.
Construction
of Bridges:
At Narayanganj part, construction of 3 nos. bridges has been completed 25 nos. is ongoing and work progress is 70%. Construction work of rest of the Bridges is in the process of tendering.
Construction
of 300 feet wide Purbachal Link Road:
Construction of all the Bridges (6 Nos.) and other structures (underpass, sluice gate etc.) on the Purbachal Link Road will be completed and road construction work is expected to be completed soon.
Utility
services:
Electric poles are already erected at sector 1, 3, 4, 5, 11, 13, 14, 17, 23, 30. Installation of electric Sub-Station at sector # 4 will be completed by February, 2015.
For updated and latest information’s please visit the official website of RAJUK.
It
will be the biggest Planned Township in the country. The Project area comprise
of about 6227 acres land located in between the Shitalakhya and the Balu River
at Rupgonj thana of Narayangonj district and at Kaligonj Thana of Gazipur
district, in the north-eastern side of Dhaka. The Township will be linked with
8(eight) lane wide express way from the Airport Road/Progati swarani crossing.
Thanks,
Related:
RAJUK Jhilmil Residential Area Flat Project
Japan will build Smart City in Bangladesh
Want to Buy or Rent an Apartment in Bangladesh
RAJUK Uttara Apartment Project in Dhaka City
Purbachal New Town Project in Dhaka City
Tourism Industry in Bangladesh | Safe Investment Option
Safe Investment Option at INANI Beach Cox’s Bazar
Used Flat for Sale in Dhaka | Secondary Property Market in Dhaka
Real Estate Companies in Bangladesh are Rising
Master Plan around Karwan Bazar
RAJUK Purbachal New Town design Approval
No comments:
Post a Comment